This Lee Company project is truly one-of-a-kind! Imagine turning dust into gold—literally. Our amazing customer works magic with precious metals, refining them from the tiniest particles. They extract valuable materials like gold, palladium, and more, all from what looks like mere dust.
Lee Company ventured into uncharted territory for this project, tackling equipment they do not usually handle. FlexCon hoppers, silos, conveyor belts—oh my! But because of the strong relationship with this customer, Lee Company was ready to embrace the challenge and dive into new adventures. Who says you can’t teach an old company new tricks?
Square Footage:
45,000 square feet
Duration: 12 months
Scope of Work:
- Placing and orienting the calciner on the foundation according to the specifications in the drawings.
- Positioning and assembly of (2) ASH silos.
- Installation of pneumatic conveying piping as shown in drawings.
- Fabrication and installation of piping support stands for piping.
- Rigging and equipment rental included for installation.
- (1) Cooling Tower CT-1.
- (1) Smelter APC System.