Lee Company provided the mechanical design and construction to allow a printing press to be moved from Strasbourg, France to Corinth, Mississippi. Lee Company provided the mechanical and plumbing portions of this project which included the removal of the existing press, press equipment, steam piping, chilled water piping, condensate piping, and ink piping systems as well as other associated utilities required by the existing press.
Duration: 10 months
Scope of Work:
- Installation of the required chilled water piping, heating hot water piping, steam piping, compressed air piping, and ink piping
- Distribution of the air to the press area in a fashion that would prevent disruption to the flow of paper to ensure the space stays negative
- Installation of emergency eye wash shower station