This 165,000 square foot new construction project consisted of eight large central station air handling units located in mechanical rooms and penthouses. The cooling plant was operated by two 300 ton chillers and associated cooling towers.
Square Footage:
165,000 square feet
Duration: 26 months
Scope of Work:
- There were two 250 BHP steam boilers with dual fuel burners to allow for alternate fuel sources
- Domestic water was generated by the use of steam
- The air distribution system consisted of 169 heating hot water variable air volume and constant volume boxes
- Humidification was provided to maintain the required humidity levels in operating and critical areas of the hospital
- Lee Company’s scope also included the design and installation of medical gas system and plumbing system